overhead railway
英 [ˌəʊvəˈhed ˈreɪlweɪ]
美 [ˌoʊvərˈhed ˈreɪlweɪ]
高架铁路
英英释义
noun
- a railway that is powered by electricity and that runs on a track that is raised above the street level
双语例句
- Also can be used on insulators of overhead wires of railway system to enhance the insulation property;
亦可用在铁路系统架空线路绝缘子处,提高其绝缘性能。 - Because of the frequent faults of pantograph and overhead contact system ( OCS) in electric locomotives, the safety and efficiency of electrified railway transportation have been seriously affected.
由于各类电力机车弓网故障不断的发生,严重影响了电气化铁路的运输安全和运输效率。 - Auxiliary supporting device of anti-hard bending for overhead line erecting on electrified railway line
电气化架线防硬弯辅助支承装置 - The article introduces in brief the principles of selection of aluminium for parts of the overhead catenary system on electric railway. and how to increase the breaking toughness and decrease the tendency of stress corrosion cracking of the parts by control alloying composition and adjust technology.
简述了用于高速电气化铁路接触网零件的铝合金的选材原则,介绍了如何通过控制合金成分、调整工艺来提高零件的断裂韧性和减少应力腐蚀开裂倾向。 - The overhead catenary is an important part of the railway system, and its fault rate is high as to the working environment.
接触网是电气化铁路系统的重要组成部分,工作环境十分恶劣,故障率较高。 - According to the principle of FEA, several kinds of overhead line clamp fittings under different load in electrification railway are analyzed by using of ANSYS program, and material nonlinear and state nonlinear are considered.
基于有限元基本原理,采用有限元分析软件ANSYS对广州地铁一号线电气化铁道接触网上几种不同类型不同荷载工况的抱箍类零部件进行了有限元分析,考虑了材料非线性、状态非线性。 - FEA for Overhead Line Clamp Fittings in Electrification Railway
电气化铁道接触网抱箍类零部件有限元分析 - OCS is the most directly correlative overhead equipments for the high-speed railway operate. It makes up by parts of contact hanging supporting structure and load-carrying cable etc. By the development of high-speed railway, the portal structure has gradually become develop trend for OCS supporting structure.
接触网是高速铁路运营最为直接相关的架空设备,由接触悬挂、支持结构、承力索等部分组成。 - Effect analysis of train-induced dynamic load on overhead crossing structure under railway
列车动荷载对下立交结构的影响分析 - The bridge prefabrication and culvert and overhead jack-in of railway are key points for construction of railway overpass bridge and culvert.
铁路立交桥涵施工重点为桥涵预制和铁路架空顶进,桥涵顶进是立交桥施工质量控制的最重要的一个环节。
